Switch Installation | T5 & T6
Estimated time: Approximately 20 minutes.
Assistance: A second person is required to help lift the Switch.
- Initial step: Remove tie-down points in the VW transporter kombi van.
- Lift the Switch high enough to clear the rear wheels.
- Align with bolt holes and loosely install bolts towards the front of the van.
- Pull out the drawer for access to the rear bolts.
- Secure all four bolts and tighten them.
- Place the bulkhead in front of the seats of the kombi van.
- Lift in the four-panel top section.
- Unfold and align the four bolt holes.
- Tighten the allen head bolts.
- Move to the side door and lift the bulkhead into place.
- Align hinges with bulkhead holes.
- Secure three screws in each hinge x4.
- Slide the bulkhead back until it hits a stop, and lift it so it fits into the housing for a snug fit.
- Install the rope through the holes at the back and tie a figure of eight knots on both sides.
- Pull the rope tight to secure knots.
- Position the rope behind the seats in a Kombi van.
- Slide the legs through the mini bulkhead mode to ensure it is secure.
- Once completed, the unit is installed and ready for use.
These instructions will apply to the Ovano Switch Narrow but also work for the Ovano Switch XL.
Ovano
Unit 4 The Courtyard, Barns Ground,
Clevedon, BS21 6TB
Mon - Thu, 9am - 5pm
Fri, 9am - 2pm
01275 261012
info@ovano.co.uk
